Services Performed
- HOOK UP VEHICLE TO SCANNER PULL CODES AND ADVISE WORK NEEDED. HAD CODES: FOUND CODES P0579 AND P0585 SPEED CONTROL CIRCUIT. TEST CIRCUIT WITH POWER AND GROUNDS AND FOUND FAULTY SPEED CONTROL SWITCH IF REPAIRS WERE MADE WE CLEARED CODES TOOK VEHICLE ON ROAD TEST AND RECHECK TO SEE IF ANY CODES CAME BACK.
- DRAIN OIL, CHANGE OIL AND FILTER, RENEW OIL, CHECK FOR ZERK FITTINGS; IF APPLICABLE LUBE ALL FITTINGS, CHECK CONDITION OF ALL FLUIDS, TOP OFF ALL FLUIDS, AIR TIRES, CHECK AIR FILTER, FAN BELTS, COOLING SYSTEM HOSES AND WIPER BLADES. RECOMMENDATIONS NOTED ON INVOICE.
- CHECK EACH TIRE AND INFLATE TO THE VEHICLE'S TIRE PRESSURE RATING AND NOTE READINGS. DRIVER SIDE FRONT PSI 36 PASSENGER SIDE FRONT PSI 36 DRIVER SIDE REAR PSI 36 PASSENGER SIDE REAR PSI 36
- CRUISE CONTROL ACTUATOR SWITCH – Remove & Replace
- EXCHANGE BRAKE FLUID IN BRAKE SYSTEM, BLEED BRAKES, ROAD TEST, ALL OKAY AT THIS TIME.
- INSTALL POWER STEERING CLEANER AND CONDITIONER, RUN THROUGH POWER STEERING SYSTEM, EXCHANGE OUT OLD FLUID AND REFILL SYSTEM ROAD TEST AND CHECK FOR LEAKS. ALL OKAY AT THIS TIME.
- TRANSMISSION OIL FILTER & PAN GASKET – Remove & Replace
- REPLACED LOWER AND UPPER GASKETS
- THERMOSTAT – Remove & Replace
- EVACUATE COOLANT FORM RADIATOR AND COOLING SYSTEM EXCHANGE COOLING SYSTEM BY ADDING NEW COOLANT. CHECK OVER FLOW BOTTLE AND ALL HOSES. PRESSURE TEST SYSTEM FOR LEAKS. ROAD TEST AND CHECK TEMPERATURE ALL OKAY AT THIS TIME.
- REMOVED AND REPLACED TIRES, VALVE STEMS OR TPMS SEALS, AND BALANCE. TEST DRIVE, AND ADVISE ON BRAKES.
- CHECK EACH TIRE AND INFLATE TO THE VEHICLE'S TIRE PRESSURE RATING AND NOTE READINGS. DRIVER SIDE FRONT PSI 36 PASSENGER SIDE FRONT PSI 36 DRIVER SIDE REAR PSI 36 PASSENGER SIDE REAR PSI 36
- HOOK UP GAUGES AND CHECK SPECS AND ADJUST FRONT AND REAR IF ADJUSTABLE.
- OEM REQUIRES THAT THE FOUR SEALING COMPONENTS BE REPLACED WHEN RE-INSTALLING A TPMS SENSOR. EACH KIT CONTAINS 1 NUT, 1 VALVE CORE, 1 CAP AND ONE GROMMET.
- CHECK EMISSION COMPONENTS FOR PROPER INSTALLATION AND TAMPERING. CHECK TIMING, AND WARNING LIGHTS PER STATES REQUESTS. RUN ON DYNO IF APPLICABLE, OR RUN NEW OIS THROUGH ALDL CONNECTOR. IF ALL ABOVE PASSES ISSUE CERTIFICATE.
- AFTER CHECK ENGINE LIGHT WAS RESET AND REPAIRS WERE MADE NEED TO ROAD TEST AND RESET MONITORS WITCH MAY BE DONE ON TEST DRIVE OR ON DYNO.